Energy Transmission Lines
132 Kv Jazair SS-Yarmook Transmission Line
Supply and erection of transmission line towers, supply of line material, wire stringing
Project Size: 135,000 man hours
132 kV New Baghdad SS - Samadia SS Transmission Line
Supply and erection of transmission line towers, supply of line material, wire stringing
Project Size: 135,000 man hours
H.178 Referenced 380 kV Adana-Iskenderun E.T. Lines
Turnkey Construction of 380 kV Transmission Lines (3 bundle 1272 MCM with OPGW)
Project Size: 1,363 tons erection, 47 km con. stringing
H.163 referenced E.T.Lines - Full supply
Turnkey construction of 154 kV E.T.Lines ( 1272 MCM ACSR conductor )
Project Size: 1,250 tons fabrication, 1,250 tons erection, 60 km. con. stringing
H.150.I referenced BURSA - GEBZE E.T.Line
Turnkey construction of 380 kV E.T.Lines ( double bundle 954 MCM ACSR conductor )
Project Size: 1,850 tons erection, 120 km. con. stringing
H.163 referenced E.T.Lines - Full supply
Turnkey construction of 154 kV E.T.Lines ( 1272 MCM ACSR conductor )
Project Size: 1,250 tons fabrication, 1,250 tons erection, 60 km. con. stringing
H.133.III referenced E.T.Lines - Full supply
Turnkey construction of 154 kV E.T.Lines ( 954 MCM ACSR conductor )
Project Size: 1,500 tons fabrication, 1,500 tons erection, 118 km. con. stringing
H.122.B ref. Goksun - Yesilhisar - Temelli E.T.L. - Full supply
Turnkey construction of 380 kV E.T.L.( triple bundle, 1272 MCM ACSR conductor )
Project Size: 4,000 tons erection, 144 km. con. stringing
H.121.IV ref. Bursa Sanayi - Bursa I (Merinos) E.T.L. -Full supply
Turnkey construction of 154 kV E.T.L. including supply of complete line material and compact tower design
( 1272 MCM ACSR conductor )
Project Size: 370 tons erection, 10 km. con. stringing
H.120 referenced Aliaga - Uzundere - Yenikoy E.T.L.
Turnkey construction of 380 kV E.T.L. (triple bundle, 954 MCM ACSR conductor)
Project Size: 3,260 tons erection, 123 km. con. stringing
H.110 referenced Ataturk - Elbistan - Ankara E.T.L. - Full supply
Turnkey construction of 380 kV E.T.L. ( triple bundle, 954 MCM ACSR conductor )
Project Size: 2,650 tons erection, 148 km. con. stringing
H.119.I referenced E.T.Lines - Full supply
Turnkey construction of 154 kV E.T.L. including supply of complete line material and tower designs ( 1272 MCM ACSR conductor )
Project Size: 2,000 tons fabrication, 2,000 tons erection, 200 km. con. stringing
H.104.B referenced Karakaya HES. - Ataturk HES. E.T.L.
Erection and stringing works of 380 kV E.T.L. ( triple bundle, 954 MCM ACSR conductor )
Project Size: 3,700 tons erection, 155 km. con. stringing
H.116.B referenced Ambarli - Ikitelli E.T.L.
Erection works of 380 kV E.T.L. ( 954 MCM ACSR conductor )
Project Size: 350 tons erection
H.111.I referenced Ordu - Golkoy E.T.L.
Erection works of 154 kV E.T.L. ( double circuit, 795 MCM ACSR conductor )
Project Size: 610 tons erection
H.113. I referenced E.T.Lines
Stringing works of 154 kV E.T.Lines ( double circuit, 795 MCM ACSR conductor )
Project Size: 216 km. con. stringing
H.109 referenced Kars - Leninakan E.T.L.
Tower design, fabrication and erection works of 220 kV E.T.L. ( 954 MCM ACSR )
Project Size: 1435 tons erection
HTC.99.II referenced Erzurum - Hinis E.T.L.
Stringing works of 154 kV E.T.L. ( 795 MCM ACSR conductor )
Project Size: 89 km. con. stringing
H.100.D referenced Kangal - Kayabasi E.T.L.
Erection works of 380 kV E.T.L. ( triple bundle, 954 MCM ACSR conductor )
Project Size: 1,400 tons erection
HTC.80.E.II.EK referenced E.T.Lines
Stringing works of 380 kV E.T.Lines ( double bundle, 954 MCM ACSR conductor )
Project Size: 38 km. con. stringing
H.95.I referenced E.T.Lines
Erection works of 154 kV E.T.Lines ( 477 MCM ACSR conductor )
Project Size: 3,700 tons erection
HTC.80.E.II referenced Soma - Balikesir E.T.L.
Stringing works of 380 kV E.T.L. ( double bundle, 954 MCM ACSR conductor )
Project Size: 65 km. con. stringing
HTC.92.I referenced E.T.Lines
Stringing works of 154 kV E.T.Lines ( 477 MCM ACSR conductor )
Project Size: 221 km. con. stringing
H.90.C referenced Cankiri - Osmanca E.T.L.
Erection works of 380 kV E.T.L. ( triple bundle, 954 MCM ACSR conductor )
Project Size: 5,176 tons erection
HTC.89.IV referenced Sereflikochisar - Aksaray E.T.L.
Stringing works of 154 kV E.T.L. ( 477 MCM ACSR conductor )
Project Size: 82 km. con. stringing
HTC.86.I referenced Oymapinar - Seydisehir E.T.L.
Stringing works of 380 kV E.T.L. ( double bundle, 954 MCM ACSR conductor )
Project Size: 85 km. con. stringing
HTC.87.II referenced Yatagan - Denizli E.T.L.
Stringing works of 154 kV E.T.L. ( 477 MCM ACSR conductor )
Project Size: 113 km. con. stringing
HTC.80.I referenced Keban - Elbistan E.T.L.
Stringing works of 380 kV E.T.L. (double bundle, 954 MCM ACSR conductor)
Project Size: 180 km. con. stringing
H.78.III referenced E.T.Lines
Fabrication and erection works of 154 kV E.T.Lines
Project Size: 5,200 tons fabrication, 5,200 tons erection
UP
Substations and Power Plants
Baiji Gas Power Plant Maintenance Upgrade
Complete erection of the 400 kV Switchyard equipment, IPB, Switchgear and control and measurement equipment, 400 kV - 2 * 150 MW
Project Size: 405,000 man hours
CAN Thermal Power Plant
2 x 160MW Transformer and Switchyard contruction and 6.6kv 4 km ETL with OPGW
Project Size: 30,500 man hours
ITM 14.D referenced KARASU Substation
154 / 33.6 kV - 2*50 MVA Transformer substation - Turnkey Erection
Project Size: 67,500 man hours
ITM 14.D referenced KURSUNLU Substation Extension
380 / 154 kV - 150 MVA Transformer substation - Turnkey Erection
Project Size: 94,500 man hours
ITM 14.D referenced Konya II Substation Extension
154 / 33.6 kV - 50 MVA Transformer substation - Turnkey Erection
Project Size: 74,000 man hours
ITM 14.D referenced Tumosan Substation Extension
154 / 33.6 kV - 50 MVA Transformer substation - Turnkey Erection
Project Size: 72,000 man hours
ITM 14.D referenced Eskisehir II Substation Extension
154 / 33.6 kV - 100 MVA Transformer substation - Turnkey Erection
Project Size: 38,000 man hours
ITM 11.B referenced MASLAK Substation
154 / 33.6 kV - 2*50 MVA Transformer substation - Turnkey Erection
Project Size: 60,000 man hours
ITM 11.B referenced BEYLIKDUZU Substation
154 / 33.6 kV - 2*50 MVA Transformer substation - Turnkey Erection
Project Size: 44,000 man hours
ITM 11.B referenced KIYIKOY Substation
154 / 33.6 kV - 25 MVA Transformer substation - Turnkey Erection
Project Size: 32,000 man hours
UP
Telecommunications
Iraq Ghammas S/S Project Comms System
PLC/PSE/PABX for Siemens
Nigerian Agip Oil Company - Comms System
MW/Mux/Shelter
Istanbul Ulasim A.S. LRT SDH & Management System
SDH (STM-1/4/16) and IONOS NMS System
Modern Enerji Comms System
SDH/FMX/PSE/PABX/Modems/LL
Iraq WII / MOE SCADA System Refurbishment Project
MW Radio Links and Multiplexers
Gaziantep OSB Comms System
Mux/PABX/Modems/LL
Mersin Soda Comms System
SDH/FMX/PSE/PABX/Modems/LL
Karadeniz Enerji Silopi Comms System
PABX/Modems
Bares Rόzgar Santrali Comms & SCADA System
SDH/FMX/PSE/PABX/Modems/LL/RTU
TEIAS 10 site FO SDH System
SDH/FMX
Cerkezkoy OSB Comms System
SDH/FMX/PSE/PABX/Modems/LL
Goltas Cimento Comms System
SDH/FMX/PSE/PABX/Modems/LL
Iraq Electric Co. Amara/Buzurgan P/P
SDH/FMX/PABX/DECT/PLC/PSE/RTU for SHAW
Iraq Electric Co. - Al Ameen S/S
FMX/HDSL/PSE for Kellog Brown and Root
Iran Rudeshur Power Plant - Comms System
SDH Optics/Mux/Power Line Carrier
Akenerji Yalova P/P
SDH/FMX/PSE/PABX/Modems/LL
Akenerji Kemalpasa P/P
SDH/FMX/PSE/PABX/Modems/LL
Iraq Electric Co. North Samara 400KV S/S
PLC/PSE/PABX/MW/Mux/Intruder Warning/PA/FAS
Istanbul Eminonu-Kabatas Tram Line
FO, SDH, PABX, SCADA, Turnstiles, TETRA Radio
Iraq Electric Co. BW & Akarkoof
PLC/PSE for WGI
Abu Dhabi ADWEA E19 Project
SDH/FMX/PABX/GA/CCTV/PSE
Iraq Electric Co. Baiji 400KV S/S
FMX/PABX/MW Radio/PSE for ODEBRECHT
Poland Eurocentrum Complex
FO, SDH, PABX, CCTV, PA, Turnstile
Copenhag Underground Metro
Train P.A., Passenger Info & CCTV technical assistance
Istanbul Metro Railway Comms System
Trunked Mobile Radio System
Iraq Electric Co. / 7/2000 Project
PLC/TPS/PABX/SCADA with Barmek
Aria GSM 1800 System 4 Cities in East
Implementation of 58 BTS + 4 BSC
Police Force MW Links - Ankara
MW Radio / FMX / NMS
Iraq Electric Co. Taji S/S & 174/2000 Projects
PLC/TPS/PABX/SDH/FO/FMX for Siemens
Turkish Electric Co. National Load Dispatch Center
Nationwide PABX / Dispatcher & Data system
Turkmenistan Balkanabat Electric Co.
Multiplexer,HDSL, PABX, PLC, LMU,LT comms system
Saudi Arabia Juba P.P
PLC, PABX, PSE comms system
Saudi SWCC Pipeline Projects
FMX commissioning along the water pipeline
Kosovo Electric Company Substation Control & Communications
Telecom, PLC, Multiplexer, LMU
Bulgaria Turkey Grid Connection Power Line Communications
SDH, Fiber Optics, PABX Communications
UP
Distribution Networks
Kutahya City Distribution Network
Turnkey design, construction, maintenance
UP
Rail Systems
Istanbul Zeytinburnu-Bagcilar Light Rail System
Turnkey Electromechanical and Telecommunication Systems
Konya Selcuk University Light Rail System
Light rail systems electromechanical works
UP
Land Development and Construction
Gaziosmanpasa Luxury Residential Complex
Land development for 30 luxury residences in Gaziosmanpasa, Ankara, Turkey
Oran Mesa Akasya Residential Complex
Land development for 168 luxury residences in Oran, Ankara, Turkey
Umitkoy Mesa Yoncaevler-2 Residential Complex
Land development for 96 luxury residences in Umitkoy, Ankara, Turkey
UP
Information Technologies
Disbank Fraud Management System
Credit card application fraud scoring system
Disbank ATM Cash Management System
Cash forecasting model for ATMs
Fraud Interlink Detection Software
Related record detection system for fraud management
Finansbank Data Mining Infrastructure
Analytical enterprise modeling infrastructure
UP
|